|
During |
|
Repairing a failed
Tie Back System that caused existing Concrete Bulkhead to lean out apx
30°
in Rock Port, Texas |
|
During |
|
Realigning and Installing
New Tie Back System for the failing Concrete Bulkhead in Rock Port, Texas |
|
During |
|
Framework to Pour
Additional Concrete
to Add Height Extention onto the
Realigned and Tied Backed Concrete Bulkhead
in Rock Port, Texas
(It Added 18 Inches to the Height) |
|
After |
|
New Height Extention
Poured onto Existing Concrete Bulkhead in Rock Port, Texas |
|
Before |
Before |
|
|
Failing Concrete Bulkhead
in Rock Port, Texas |
|
|
|
Repaired Failing
Concrete Bulkhead by Realigning and Installing New Tie Back System
in Rock Port, Texas |
|